Notre Dame Academy – Control Booth
Notre Dame Academy
Architect
Wolnitzek Architects
Cost of project
$4.5 million
Building Size
19,821 sq ft

HMBA served as the Theater, Acoustical and AV Consultants for NDA’s new $4.5 million dollar Performing Arts Center. The all girls Catholic High School located in Northern Kentucky has a very active performing arts program, mounting five theater and musical-theater productions along with two musical concerts each year. The 405 seat proscenium theater was completed in 2009. The new theater serves as one of the primary venues for the Kentucky Symphony Orchestra and several local dance companies. The facility is equipped with state-of-the-art theater technical systems all designed by HMBA.